jebrinlayan9000 jebrinlayan9000
  • 02-05-2021
  • Mathematics
contestada

Mr. Kumar is getting his house renovated. 1/5 th of the work has been completed in 2 months. How much time will it take for the entire work to be completed?

Respuesta :

liam2747
liam2747 liam2747
  • 02-05-2021

Answer:

10 months

Step-by-step explanation:

If it takes 2 months to do 1/5th, it will take 4 months to do 2/5, 6 months to do 3/5, 8 months to do 4/5, and 10 months to do 5/5 or in other words the whole thing.

Answer Link

Otras preguntas

What is the unit price for thecans
Is a biography of Albert Einstein a primary source or a secondary source
how did the American Revolution impact the economic relationship between Great Britain and its mainland colonies? Is it reasonable to conclude that political in
A striated muscle controls movement of the body in relation to the environment. a. True b. False
Solve by making an equation The first side of a triangle is twice the length of the second side; the third side is 20 feet less than three times the second side
Show that for the same shear angle, there are two rake angles that give the same cutting ratio.
What does usb stand for
What organic molecule is the major energy source for most of the body's cells? a. carbohydrates?
In a sample of 200 students, what is the probability that over 31% of the sample has ap credit?
Total institutions, such as boot camps, prisons, and some mental hospitals, are examples of