PLEEASE ANWER QUICK: The project manager is writing the requirements document. Which phase of the project life cycle is he in?
project closure
project planning
project initiation
project execution ​

Respuesta :

Animmango
Animmango Animmango
  • 01-05-2021

Answer:

I think, project execution. He is writing the requirements document. which mean it doesn't project closure and initiation. then he did it which mean it doesn't project planning.

Answer Link

Otras preguntas

average acceleration is the slope of velocity vs. time graph True or false
a basketball has volume of 5600cm find the radius​
A 0.200-kg cube of ice (frozen water) is floating in glycerine.The gylcerine is in a tall cylinder that has inside radius 3.90 cm. The level of the glycerine is
Write an equation: The sum of -7 and a is equal to 37
which of these quadrilateral types must have congruent diagonals. a. rectangle, square, rhombus b.square, rhombus
help me with the work
An object of mass m travels along the parabola yequalsx squared with a constant speed of 5 ​units/sec. What is the force on the object due to its acceleration a
A customer cash a 1000.00 check at 3 percent how much does he receive back?
How did women's roles change as a result of the industrial revolution in europe? A. Women earned the right to vote in most democracies by organizing protests.
The net of a square pyramid is shown: