kadenceclay26
kadenceclay26 kadenceclay26
  • 03-10-2016
  • Mathematics
contestada

a contractor's crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Respuesta :

charstar
charstar charstar
  • 03-10-2016
54/3=18

hope this helps :)
Answer Link

Otras preguntas

¿Cuál no es un ingrediente de una pizza?
In a swimming race, Miho swam the first 50 m in 42 s. She swam the second 50 m in 40 s. What was Miho's average speed during the race? a.1.22 m/s b.1.25 m/s c.1
Can anybody help me out???!?!?
How did the united states help rebuild european cities and increase prosperity at home after world war ii?
How did farming change during the roman republic period
Potassium-40 has a half-life of 1.277 mc013-1.jpg 109 years. After 1.022 mc013-2.jpg1010 years, how much potassium-40 will remain from a 500.3-g sample? approxi
A barrel had 20 liters of water. Water leaked out from the barrel at a constant rate. After 24 hours, 14 liters of water was left in the tank. How many liters o
With which genetic region does the repressor protein interact?
Can rocks be weathered by wind and chemicals in the air
Briefly outline a procedure you could use to determine the hc2h3o2 concentration in a vinegar sample