katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

Which of the following is a respectful way to express your opinion? “You obviously didn’t listen.” “You don’t know what you are talking about.” “I disagree. In
Where does a grassroots movement begin?
Which of the following shared trait of artists and inventors allows an artist to render accurate images on canvas and an inventor to create a detailed model of
a wire is bent to form 4 semicircles. how long is the wire. with diameter of 35 cm
why does food coloring diffuse faster in cold water than warm
April had 3 7 of a pound of pecans. Her sister ate 2 3 of April's pecans. How many pounds of pecans did April's sister eat?
OBSERVE A EQUAÇÃO DO 2 GRAU NA VARIAVEL X E RESPONDA O QUE SE PEDE
Occurs when members of the marketing channel collude to control the prices passed on to consumers.
Which of the following is NOT a proper way to operate a forklift carrying a heavy load: A :Allow someone to ride on the load to help secure it B. Keep your sp
why did john brown attempt to seize the federal arsenal at Harpers Ferry, Virginia?